Garden path

INSTALLATION STEPS

STEP 1 :
Choose and place the natural stones on the floor at the desired location.

STEP 2 :
Cut out the existing turf using the edge trimmer around the stone while keeping its shape.

STEP 3 :
Set the stone aside, remove the grass and dig 2 to 3 inches deep.

STEP 4 :
Cut the geotextile membrane according to the shape and cover the bottoms.

STEP 5 :
Spread 1 to 2 inches of dust.

STEP 6 :
Place the natural stones in their locations, making sure they are stable, level and do not jiggle.